How to Do a Climbing Partner Check: CRASH
Intro to Climbing Learning Centre
Lesson 6 of 11
Intro to Climbing
The partner check to use before every climb, every time.
Safety note: These lessons are a reminder of skills taught in person. They do not replace hands-on instruction or supervised practice. Climbing and belaying can cause serious injury or death. Do not belay or climb without supervision until a qualified instructor has confirmed your skills, and always follow the manufacturer's instructions for your equipment.
Many climbing accidents come from simple, preventable errors: an unfinished knot, an unlocked carabiner, a rope loaded backwards, or no knot in the end of the rope. A partner check before every climb catches these errors while you are still on the ground. We practise these checks in our Intro to Rock Climbing course.
CRASH Checklist: Carabiner, Rope, Anchor, Stuff, Harness and Helmet
| Letter | Check |
|---|---|
| C: Carabiner | Locking carabiner through the belay loop and the belay device. Gate closed and locked (squeeze check). |
| R: Rope | Device loaded the right way. Figure 8 follow-through through both tie-in points, dressed, with a tail. Stopper knot in the rope end. |
| A: Anchor | Look up. Rope runs cleanly through the anchor, not tangled or twisted, and the two strands are not wrapped around each other. |
| S: Stuff | Hair tied back, no dangling jewellery or scarves, pockets empty, base area clear. |
| H: Harness and Helmet | Harness above the hip bones, snug, buckles fastened, no twists. Helmets on and buckled. |
How to Check Your Climbing Partner Before Leaving the Ground
- 1 The climber ties in and the belayer sets up the device.
- 2 Check your own system, then your partner's, letter by letter. Point to it, touch it, say it out loud. For the anchor, both of you look up.
- 3 If anything looks wrong, stop and fix it. It is never rude to double-check.
- 4 Before you leave the ground, agree on the commands you will use and the plan at the top. Make sure you are both focused and ready.
- 5 Only then: "On belay?" / "Belay on." If either of you unties, unclips or gets distracted, check again.
Common mistakes to avoid
- A quick glance from a few metres away instead of a close, hands-on check.
- Skipping the check when you're rushed, chatting, or on your "last climb of the day".
- Forgetting the stopper knot in the end of the rope.
Want more Squamish climbing tips in Google? Add Squamish Climbing Academy as a preferred source.
Learn this in person
This lesson is taught hands-on with a qualified guide in:
Intro to Rock Climbing · Intro & Anchors Weekend Combo · Youth Climbing Camps
Questions and Comments
Have a question about this lesson? Share what you are working on, ask for clarification or join the conversation.
No comments yet. What would you like to know?
